Project 102

Here I took a length of split wood, cut it into 3rds and then split those into small sections. Next I stabilized the wood over several days as it was weak and punky. A bright green epoxy was mixed and added to the sections. The project is now in the pressure pot for a couple days.

The epoxy is added and the wood, as expected, floats. A circle of wood with Bob, the weight, are added to sink the wood into the epoxy for the vacuum chamber and pressure pot.

One thought on “Project 102”

Leave a Reply

Your email address will not be published. Required fields are marked *